Desanding Plant for Indonesian Pipe Jacking Construction

Desanding Plant for Indonesian Pipe Jacking Construction

Recently, two sets of 200m³ desanding plants from Brightway were delivered to Indonesian customers to assist in the construction of local pipe jacking projects.

Read More

Pipe-jacking Project Desanding Plant to Malaysian

Pipe-jacking Project Desanding Plant to Malaysian

Recently, a 250 m desanding plant of Brightway has been ready for delivery to Malaysian customers. This desanding plant is equipped with shale shaker, desander and desiler, and its designed treatment capacity is 250 m/h. The system is mainl

Read More

BWSP-350 Slurry Separation Plant for pipe jacking project Sent to Singapore

BWSP-350 Slurry Separation Plant for pipe jacking project Sent to Singapore

On March 11, 2022, a BWSP-350 slurry separation plant of Brightway was loaded and ready to be delivered to Singapore customers. This slurry separation plant is specially designed and produced for the pipe jacking construction project of an u

Read More

Brightway BWZS104 Drilling Fluid Shale Shaker Shipped to Japan

Brightway BWZS104 Drilling Fluid Shale Shaker Shipped to Japan

On August 22, the BWZS104 drilling fluid shale shaker produced by Brightway for Japanese customers was shipped to Japan.

Read More

HDD Drilling Mud Recovery System Helps Underground Optical Cable Laying Projects

HDD Drilling Mud Recovery System Helps Underground Optical Cable Laying Projects

This mud recovery system is the third time the customer has cooperated with Brightway. In October of last year and June of this year, Brightway customized two sets of 120 cubic and 90 cubic mud recovery systems for this customer, respectively. At pres

Read More