Slurry Treatment Solution in Trenchless Construction
In Trenchless Construction, heavy drilling slurry and cuttings is produced. How to process the slurry ? Let Brightway intruduce the solution of Slurry Treatment in Trenchless Construction.
Trenchless Construction & Technology is a type of subsurface construction work that requires few trenches or no continuous trenches. Trenchless construction includes such construction methods as tunneling, microtunneling (MTM), horizontal directional drilling (HDD) also known as directional boring, pipe ramming (PR), pipe jacking (PJ), moling, horizontal auger boring (HAB) and other methods for the installation of pipelines and cables below the ground with minimal excavation. Large diameter tunnels such as those constructed by a tunnel boring machine (TBM), and drilling and blasting techniques are larger versions of subsurface construction.
According to different construction methods, we choose the matching equipmen as the good Slurry Treatment Solution to separate the slurry in Trenchless Construction, such as slurry treatment plant ( separation plant ), desanding plant, mud recycling plant etc. details as follow:
1. Tunnel boring machine (TBM), Generally, we use large separation plant, it is the large capacity separation system. (2000-4000m³/h). Know more
Brightway Separation Plant for TBM.